Two (2) surface rigs were deployed in several localities drilling boreholes up to 220m in length. The project contained from sparse green field borehole to regularly-spaced boreholes in proximity to know deposits. Geotest offered a full package including drilling, core orientation, geological logging R&R estimation and open pit design.
It is a challenging project with services ranging from green field exploration to near-mine drilling and includes mining support services (geological modelling, R&R estimation and pit design).