One (1) surface rig was deployed to conduct exploration drilling in a 50x50m grid. A combination of destructive and wireline core drilling was necessary to fulfil project requirements and identify the geometry of subsurface chromite deposit. Vertical boreholes reached a maximum depth of 360m providing useful insight into the geology of the area and the shape of the deposit.
The project included a combination of destructive and core drilling down to the desired depth.